Electrical installation works
Electrical installation
work of any complexity
JSC Tatelektromontazh performs electrical installation work of the full cycle: from design preparation and installation to commissioning and commissioning of the facility. The work includes 110–220 kV substations, cable lines, metro and petrochemical facilities.
Substations 110–220 kV
Construction and reconstruction of substations, installation of outdoor switchgear equipment using block modular structures, overhead line connections. Our own metal structures plant allows us to carry out this work under a single contract.
Overhead lines 0.4–220 kV
Construction and reconstruction of overhead lines, installation of self-supporting insulation systems, overhead lines entering substations and power supply of industrial sites, including facilities of OJSC Tatneft.
Cables 10–220 kV (XLPE)
Mechanized laying of cable lines using the Jakob Thaler Cable Dog complex, KE-SP 3050 winches, KPR-3500 system and roller guides of our own design.
Metro and transport
Electrical installation for Kazan and Moscow metro facilities: traction and transformer substations, electrical depots and engineering infrastructure.
Petrochemicals and industry
Electrical installation at industrial sites and in explosive areas, airport lighting, installation of busbars in the Alabuga FEZ, at the facilities of Nizhnekamskneftekhim OJSC, Kazanorgsintez OJSC and KamAZ OJSC.
Infrastructure objects
Electrical installation of medical centers, cultural and sports facilities, residential and public buildings, as well as outdoor lighting systems.
Installation of end, connecting and screen-separation couplings for cables made of cross-linked polyethylene 110–220 kV is carried out by trained and certified personnel using specialized tools.
One of the company’s major projects is the laying of single-core XLPE cables 110 - 220 kV in tray cable trenches with a total length 115 km at a complex of oil refineries OJSC "TANECO in Nizhnekamsk.
Particularly large-scale and strategically important work was carried out during construction Kazan metro. Within 8 months, the launch of five stations and an electrical depot was ensured, and work on engineering systems and a compressor station was completed.
At the facilities of the special economic zone FEZ "Alabuga" Hundreds of kilometers of modern busbar trunking systems have been installed - industrial-grade trunking, distribution, trolley and lighting equipment.
115 110 km of single-core XLPE cables 220–. kV in specialized tray trenches at a complex of oil refineries and petrochemical plants in Nizhnekamsk.
A full range of electrical installation works, commissioning within 8 months, traction substations and engineering infrastructure.
Traction and tunnel cable lines, traction substations "Lesoparkovaya", "Bitsevsky Park", electric depot "Mitino" and "Likhobory".
Deep reconstruction of 110 kV electrical equipment of the main step-down substations of the largest automobile plant in Russia.
Installation and commissioning of GPP 110/35/10 kV. Full cycle of work on high-voltage electrical equipment of the plant.
Multi-kilometer trunk, distribution, trolley and lighting busbar lines for residents of the special economic zone.
Request a quote
Describe the object and initial data - specialists will prepare calculations, scope of work and approximate deadlines.