Kazan Commissioning Department (KPNU)


KPNU Tatelektromontazh JSC

Commissioning and Testing and Start-up of
Equipment

The Kazan Commissioning Department has been operating since 1966. The division performs adjustment, testing, service support, inspection, measurements and preparation of electrical equipment for safe operation at construction, reconstruction and overhaul sites.

1966year established
5commissioning sections
Electrical Labshigh-voltage laboratories
ISOquality management system
Final engineering control before start-up From circuit checks and measurements to the start-up of complex electrical equipment.

What KPNU Does

KPNU covers the full cycle of preparing electrical equipment for operation: commissioning, service, inspection, preventive testing, measurements and engineering support for complex electrical systems.

Adjustment and Testing

Adjustment of electrical equipment, automation systems and instrumentation at new construction, reconstruction and overhaul sites.

Service and Inspection

Service maintenance, repair, inspection and technical condition checks of electrical equipment before start-up or after modernization.

Measurements and Preventive Testing

Diagnostic measurements, preventive tests and monitoring of electrical installation parameters using test equipment.

Scientific and Technical Services

Engineering support, analysis of test results, preparation of recommendations and operational support for complex electrical systems.

Laboratories and Production Base

KPNU is equipped with modern measuring instruments, test equipment and mobile high-voltage electrical laboratories.

Commissioning Sections

The department includes five commissioning sections that handle tasks at industrial, energy and infrastructure facilities.

Production Preparation Section

The section calibrates and repairs the department measuring instruments and test equipment.

Test Benches for Commissioning Works

The division develops, manufactures and implements mobile and stationary test benches for commissioning works.

Experience on Major Projects

The department has performed commissioning works at enterprises in Tatarstan, major construction projects across Russia and international sites. This section presents the key facts in a compact, readable format.

Kazan Aviation Plant Kazan Metro KAMAZ SEZ "Alabuga" TANECO Rostselmash Baikonur Nizhnekamskneftekhim Nizhnekamskshina Kazan Organic Synthesis Plant Cuba Mongolia Korea Turkey Algeria

Electrical Laboratory Documents

The document section remains on the page: the electrical laboratory registration certificate, annexes and supporting materials open in a modal viewer without leaving the page.

Radik Minvalievich Gainullin

Head of KPNU since 2022

An engineer and graduate of Kazan State Power Engineering University. He has worked in the Kazan Commissioning Department since 2003, growing within the division and specializing in adjustment, testing and technical support of electrical equipment.

Contacts КПНУ

Tel.: (843) 598-41-57

Email: kpnu@tatem.ru

Адрес: 420132, Kazan, Adoratskogo St., 50a

Chief Engineer: Irek Marsovich Sharafeev